A3 Hindhead – 2008-2012

A3  Hindhead

In Between 2008 and 2012 Lochwynd successfully completed the A3 Hindhead Tunnel project consisting of:

All of the above Systems included associated civil engineering infrastructure, cabling, terminations, testing and certification to relevant standards. Each system had full commissioning and integration to the main systems.