Over the past 3 years, Lochwynd have been awarded and successfully installed over 250 MIDAS Loop Sites over 2 Sections and 6 Phases of the M25 Widening Scheme. Loops were installed over varying surface make-up under tight time restrictions.
These features are currently in development. But we hope to have them ready soon.
Over the past 3 years, Lochwynd have been awarded and successfully installed over 250 MIDAS Loop Sites over 2 Sections and 6 Phases of the M25 Widening Scheme. Loops were installed over varying surface make-up under tight time restrictions.